Share this story:

Resouro Strategic Metals Inc Tiros Drilling Continuing to Deliver High Grade Results



Resouro Strategic Metals Inc.

  

Toronto, Ontario TheNewswire - (Newsfile Corp. March 13, 2024) - Resouro Strategic Metals Inc. (TSX-V: RSM) (FSE:BU9) (“RSM”, "Resouro" or the "Company") is pleased to provide an update on activities at the Tiros Rare Earths and Titanium project in Brazil (“Tiros Project” or “Project”).

 

Highlights from the latest drilling results include:

 

ACTIR33 40 metres at 4,343ppm TREO 1,000ppm NdPr and 11.46% TiO2, from 10 metres ACTIR36 40 metres at 4,576ppm TREO and 928ppm NdPr and 15.15% TiO2, from 6 metres

Exploration

The drilling campaign at Tiros has been designed to increase the geological understanding of the Tiros central Mineral Rights to enable a geological resource model to be produced and to estimate a Maiden JORC Resource. A large number of samples from the recent drilling are still at the laboratory awaiting analysis. The results announced to date, including those in the Company's announcement of January 18, 2024 - “Recent Drilling Results Released Producing Highest Grade/Thickness Results from the Tiros Project”) together with the results detailed in this announcement, demonstrate the significant potential for Tiros to be an industry leading project.

 

Selected Intercepts from the latest drilling at Tiros include;

 

Hole_ID

From

To

Thickness

TiO2 %

NdPr ppm

TREO ppm

ACTIR-27

39

43

4

22.84

1,984

8,676

ACTIR-28

32

36

4

24.60

1,829

7,958

ACTIR-31

35

45

10

21.76

1,595

7,980

ACTIR-32

51

54

3

23.33

2,316

10,456

FDTIR-01

15.4

21.4

6

23.03

2,413

10,028

FDTIR-02

35

45

7

17.09

1,763

7,012

FDTIR-03

3

10

7

22.86

2,083

9,310

 

To date the orebody is open in all directions and has continued to show drilling and assays in all directions containing the typical high-grade materials found and reported to date. For the full details refer to Table -1, see below for the details. The potential quantity and grade is conceptual in nature. There has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

  

Hole_ID

From

To

Thickness

TiO2 %

NdPr ppm

TREO ppm

ACTIR-25

44

59

15

10.04

973

4,085

ACTIR-27

30

46

16

15.69

955

4,456

Includes

39

43

4

22.84

1,984

8,676

ACTIR-28

32

80

48

12.31

845

3,713

Includes

32

36

4

24.60

1,829

7,958

ACTIR-29

45

74

29

12.11

894

3,943

ACTIR-30

18

48

30

10.93

1,065

4,481

ACTIR-31

33

59

26

15.13

1,458

6,410

Includes

35

45

10

21.76

1,595

7,980

ACTIR-32

51

63

12

13.80

1,203

5,306

Includes

51

54

3

23.33

2,316

10,456

ACTIR-33

10

51

40

11.46

1,000

4,343

ACTIR-34

53

67

14

14.00

1,102

5,166

ACTIR-36

6

46

40

15.15

928

4,576

ACTIR-37

22

49

27

10.47

624

3,198

ACTIR-38

20

56

36

11.89

688

3,278

ACTIR-39

6

7

1

8.59

1,250

4,378

FDTIR-01

12.4

21.4

9

20.15

1,752

7,930

Includes

15.4

21.4

6

23.03

2,413

10,028

FDTIR-02

34

58

17

12.47

1,274

5,226

Includes

35

45

7

17.09

1,763

7,012

FDTIR-03

3

26

18

14.58

1,731

6,972

Includes

3

10

7

22.86

2,083

9,310

Table -1 Recent Assay Results from the Tiros Central block exploration program showing globally significant grades and orebody thickness

  

Exploration has focused on the Tiros Block located in the centre of the Project Area, which makes up approximately 9% of the total 477km2 Tiros Project (see Figure 1). RSM recently acquired additional Mineral Rights in the Northern and Southern areas, and initial exploration data indicates similar potential to the Tiros central tenements. Resouro’s exploration team has developed a scout drilling plan to further assess the potential of Capacete Formation identified in the new Mineral Rights.

  

Figure 1 The Tiros Project showing the recently completed exploration in the Tiros central tenements (yellow) and the recently approved and existing tenements to the north and south presently being scheduled for exploration

  

Metallurgical Testwork

 

Resouro has commenced engaging a number of leading laboratory and subject matter experts to undertake conventional Ionic Clay Extraction and non-conventional tests that have shown promise of much greater recoveries seen in the industry. Works that will be undertaken are targeting towards producing a series of flowsheets options to produce Mixed Rare Earth Carbonates and TiO2 Concentrates. This work will include an extensive program including;

 

1. Physical and chemical characterization of the representative samples

  • granulochemicalanalysis; 

  • petrographicstudy; 

  • X-ray diffractometry; 

  • SEM-EDS; 

  • characterizationofnaturalfines andfinesgrinding; 

  • comminution,particlesizeseparation; 

  • measurementofthedegree ofrelease; 

  • studiesofphysical concentration,withemphasisonmagneticseparation. 

 

2. Studies of enrichment of raw materials (hydrometallurgy and pyrometallurgy operations) and processing / use of tailings stability of crystalline phases versus temperature variation;

  • chemicalreactivitytests-dependenceonchemicalreagentconcentration,temperatureandreactiontime, 

  • massrecoveries,filtrationratesandtailingsdisposal, 

  • chemicalprocessing,massbalanceandenergyroute, 

  • optimizationofthe variablesofthetechniqueandconsumptionofrawmaterials, 

  • obtainingandcharacterizing theproduct(s), 

  • Processingflowchart,materialbalanceandenergy. 

 

Quality Assurance Quality Control

 

A QA/QC program is in place for every batch of samples sent to the laboratory including blanks, different types of standards, for REE and titanium, and also field duplicates. Further, a number of samples in each batch are later chosen for testing in a secondary laboratory and in the primary laboratory, as pulp or coarse duplicates.

 

Qualified Person

 

The technical content of this news release has been reviewed and approved by Rodrigo Mello B.Sc. Geology, FAusIMM and a qualified person as defined by National Instrument 43-101. Mr Mello has reviewed and verified the drilling and assay data included in this announcement.

 

Next Steps

 

Drilling at Tiros has produced consistently thick intercepts at elevated Rare Earth and TiO2 grades which provides Resouro with a high level of confidence to proceed to further technical studies. The next step is to estimate a JORC Compliant Resource Exploration Target and then incorporate all of the assays from samples pending from the laboratory with the aim to produce a Maiden JORC Resource. This information together with the results of Metallurgical test-work, when received, will be used to build a comprehensive Geo-metallurgical model of the deposit. The Geo-metallurgical model will be the be the foundation for the Company's technical studies.

 

Commenting on the latest drilling and assay results and exploration update for the Tiros Project, CEO and President of Resouro, Chris Eager, commented:

 

“The remarkable thing about Tiros is the consistency and continuity of high TREO grades and very high NdPr grades strongly correlated with extremely high TiO2 Grades. The orebody is unconstrained in every direction including depth and combined with our recently approved northern and southern tenements,

 

highlight the potential of the scale of the Tiros Project. For this reason, the Board has approved the advancement of the project technical studies which is under detailed review. This work is intended to highlight the potentially significant value that could be derived from the Tiros asset. I am looking forward to sharing detailed results on this work over the coming months.”

On behalf of the Board of Directors, Chris Eager, President & CEO RESOURO STRATEGIC METALS INC.

For further information, please contact the Company at:

 

Chris Eager, CEO chris.eager@resouro.com

+44-738-805-7980

 

Forward-Looking Information

 

This news release contains certain "forward-looking information" within the meaning of applicable securities law. Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. In particular, this news release includes forward-looking information regarding exploration and drilling activities, the potential for Tiros to be an industry leading project and the Company’s plans relating to metallurgical testwork and further technical studies. Although we believe that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. We cannot guarantee future results, performance or achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or in part, as those set out in the forward-looking information.

 

Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking information. Some of the risks and other factors that could cause the results to differ materially from those expressed in the forward-looking information include, but are not limited to: general economic conditions in Canada and globally; industry conditions, including governmental regulation and environmental regulation; failure to obtain industry partner and other third party consents and approvals, if and when required; the need to obtain required approvals from regulatory authorities including TSX Venture Exchange; stock market volatility; liabilities inherent in the mining industry; competition for, among other things, skilled personnel and supplies; incorrect assessments of the value of acquisitions; geological, technical, processing and transportation problems; changes in tax laws and incentive programs; failure to realize the anticipated benefits of acquisitions and dispositions; and the other factors. Readers are cautioned that this list of risk factors should not be construed as exhaustive.

 

The forward-looking information contained in this news release is expressly qualified by this cautionary statement. We undertake no duty to update any of the forward-looking information to conform such information to actual results or to changes in our expectations except as otherwise required by applicable securities legislation. Readers are cautioned not to place undue reliance on forward-looking information.

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

_        

 

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities of the Company in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”) or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the

U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.