Baru Gold Begins Exploration of 23 New Structural Study Targets with Promising Results from Kingston Target
February 14, 2022 – TheNewswire - Vancouver, BC - Baru Gold Corp (the “Company” or “Baru”) (TSXV:BARU) | (OTC:BARUF) is pleased to announce that it has commenced field analysis of the 23 new exploration targets identified in the structural study with some promising initial results.
Initial field analysis began with mapping and sampling of artisanal workings beyond the western boundary of the Priority 1 Kingston Target which has been named Kingston West and then progressed to the mapping and sampling of outcrops found within Kingston.
Assay results of the samples taken from the Kingston West Target returned an average gold grade of 1.84g/t and 2.89g/t for silver. Kingston West contains potential ore grade samples obtained from strongly oxidised quartz veins in tuffaceous andesite returning assays ranging from 0.83g/t – 5.57g/t for gold and 0.90g/t – 9.10g/t for silver.
Assay results from the samples taken from within the Kingston Target returned an average gold grade of 3.89g/t and 3.79g/t for silver. Kingston contains potential ore grade samples obtained from oxidised hydrothermal breccia with tuffaceous andesite and from strongly oxidised quartz veins in tuffaceous andesite returning assays ranging from 0.84g/t – 14.60g/t for gold and 1.70g/t – 13.10g/t for silver.
The 14.60g/t gold assay was obtained from a tuffaceous andesite containing a 0.73m wide strongly oxidised sheeted vein stockwork containing veinlets of quartz ranging from 0.5cm – 10cm wide. An example of the quartz veinlet is shown in Figure 1.
These initial sample results from the Kingston West and the Priority 1 Kingston Target areas have provided some ground truthing of the first of 23 New Exploration Targets defined by the structural study conducted by Murphy Geological Services.
Mr. Frank Rocca, Chief Geologist of Baru, commented, “These are exciting times for the exploration team as we seek to expand our knowledge of the CoW beyond the known Binebase-Bawone deposits for additional ore resources. I look forward to reporting the results of further Field Analysis by the exploration team in due course.”
Figure 1. Quartz veinlet sample assayed as 14.60g/t Au & 4.00g/t Ag
ABOUT SANGIHE GOLD PROJECT
The Sangihe Gold Project (“Sangihe”) is located on the Indonesian island of Sangihe, off the northern coast of Sulawesi. Sangihe has an existing National Instrument 43-101 inferred mineral resource of 114,700 indicated and 105,000 inferred ounces of gold, as reported in the Company's "Independent Technical Report on the Mineral Resource Estimates of the Binebase and Bawone Deposits, Sangihe Project, North Sulawesi, Indonesia" (May 30, 2017). Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. The Company intends to proceed to production without the benefit of first establishing mineral reserves supported by a feasibility study.
The Company's 70-percent interest in the Sangihe-mineral-tenement Contract of Work ("CoW") is held through PT. Tambang Mas Sangihe (“TMS”). The remaining 30-percent interest in TMS is held by three Indonesian corporations. The term of the Sangihe CoW agreement is 30 years upon commencement of the production phase of the project.
Baru has met all the requirements of the Indonesian government and has been granted its environmental permit. The Company has received approval for the upgrade of its licence to advance the Sangihe project to construction and production in 2022.
Note: The Company cautions readers that the any production decision made by the Company will not be based on a NI 43-101 feasibility study of mineral reserves that demonstrates economic and technical viability and as such, there may be involved increased uncertainty and various technological and economic risks such as the interpretation of drill results; the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with our expectations; commodity and currency price fluctuation; failure to obtain adequate financing; regulatory, recovery rates, refinery costs, and other relevant conversion factors, permitting and licensing risks; general market and mining exploration risks and production and economic risks related to design and engineering, manufacturing, technological processes and test procedures and the risk that the project's output will not be salable at a price that will cover the project's operating and maintenance costs.
ABOUT BARU GOLD CORP.
Baru Gold Corporation is a dynamic junior gold developer with NI 43-101 gold resources in Indonesia, one of the top ten gold producing countries in the world. Based in Indonesia and North America, Baru’s team of mining and finance professionals boasts extensive experience in starting and operating small-scale gold and coal assets. With sufficient funds and strong retail and institutional shareholder support, Baru is positioned to become Indonesia’s next gold producer.
Frank Rocca, BAppSc.(Geology), MAusIMM, MAIG, Chief Geologist of East Asia Minerals Corp. is the Qualified Person as defined under NI 43-101 who has reviewed and approves the content of this release.
BARU GOLD CORP
Per: “Terry Filbert”
Terry Filbert, Director
President & CEO
info@barugold.com
+1-206-890-8285
For investor contacts more information, please contact:
Kevin Shum
Investor Relations
kevin@jeminicapital.com
647-725-3888 ext 702
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Certain statements in this News Release, which are not historical in nature, constitute “forward looking statements” within the meaning of that phrase under applicable Canadian securities law. These statements include, but are not limited to, statements or information concerning future work programs, results and timing of any work programs, the Company’s performance or events as of the date hereof. These statements reflect management’s current assumptions and expectations and by their nature are subject to certain underlying assumptions, known and unknown risks and uncertainties and other factors which may cause actual results, performance or events to be materially different from those expressed or implied by such forward looking statements. Those risks include the interpretation of drill results; the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with our expectations; commodity and currency price fluctuation; failure to obtain adequate financing; regulatory, recovery rates, refinery costs, and other relevant conversion factors, permitting and licensing risks; general market and mining exploration risks and production and economic risks related to design and engineering, manufacturing, technological processes and test procedures and the risk that the project’s output will not be salable at a price that will cover the project’s operating and maintenance costs. Forward-looking statements should not be construed as investment advice. Readers should perform a detailed, independent investigation and analysis of the Company and are encouraged to seek independent professional advice before making any investment decision. Accordingly, readers should not place undue reliance on any forward-looking statement. Except as required by applicable securities laws, the Company disclaims any obligation to update or revise any forward looking statements to reflect events or changes in circumstances that occur after the date hereof.