Angkor Resources Expands Block VIII with Mussel Basin Approval

GRANDE PRAIRIE, ALBERTA — September 10, 2025 — Leads & Copy — Angkor Resources Corp. subsidiary EnerCam Resources Co. Ltd. has received approval from government authorities for an additional 220 square kilometers added within the Block VIII boundaries, referred to as the Mussel Basin.

With the added area, Block VIII is now 4277 square kilometers. The company removed all parks and protected areas from development.

EnerCam President Mike Weeks said the company is very happy to add the Mussel Basin area to be part of Block VIII. He said it is a significant area with strong indications as an added sub-basin for exploration and development of oil and gas in Cambodia.

EnerCam senior geologist and reservoir specialist Justin Snelling describes the basin as a self-contained, Cenozoic age sedimentary basin. He said the additional land parcel brings all prospective sedimentary zones of interest fully into Permit Block VIII and allows the company to properly evaluate it with new 2-D seismic lines acquired during current field seismic operations.

A review of the two 2008 vintage Accelerated Weight Drop (AWD) 2-D seismic lines has identified interesting potential stratigraphic trapping anomalies that together with the known legacy surface oil seeps documented here making this basin a prospective target for early exploratory drilling.

Next steps will be incorporating the seismic lines of Mussel Basin into the seismic program and completing that for processing and interpretation, targeting September 20, 2025.

ANGKOR Resources Corp. is a public company, listed on the TSX-Venture Exchange, and is a resource optimizer in Cambodia working towards mineral and energy solutions across Canada and Cambodia.

CONTACT: Delayne Weeks - CEO, Email: info@angkorresources.com, Telephone: +1 (780) 831-8722

Source: ANGKOR Resources Corp.